Saturday, February 6, 2016

Farmington Historical Society Newsletter

Check this out!! The Farmington Historical Society published a great article about Wilford Woodruff, the Temple and the historical connection between Mormons and the Town of Farmington.

A great big thank you to FHS! And to the article's author, Earle Stone!

Farmington Historical Society Newsletter

Wednesday, January 27, 2016

January 17, 2016

Frosty views from the Northwest side!

Here's what has been going on at the Temple site this week: Workers have begun painting interior walls. There are light fixtures being installed and marble flooring laid. Millworkers have been hard at work on the ceiling of the Celestial Room (which is located on the western end of the Temple), installing decorative components. Sure to be magnificent!



Wednesday, April 29, 2015

Sunset

The end of another beautiful day at the Temple site....

Wednesday, April 1, 2015

The latest aerials!

Check out these latest aerial photos of our Temple. They were taken just this last week. I wish President Everette had an x-ray vision lens that could show us all the wonderful work going on inside while the snow and cold is slowing the work on the exterior.



 

Wednesday, March 18, 2015

March 17, 2015

The warmer weather (thank you, March!) has kickstarted work on the Temple's exterior. Here's a shot of the crew installing steel reinforcement along the upper exterior walls. This steel will secure the stone for the Temple's future parapet.

Monday, February 16, 2015

February 16, 2015: It's cold outside!

 
 
 
 
A cold, sunny day, side view!  Sheet rock is going up at a steady pace inside the Temple.  Stone work on the exterior will restart as soon as the weather warms....praying (along with the rest of New England) that happens soon!
 

Thursday, August 14, 2014

The latest news!

Here is the latest aerial shot of the temple....looking better every day!



Also, Elder Holbrook recently reported the following progress:
*The permanent roof is being installed following the installation of a temporary roof to allow us to work inside the building.
*The structural steel is erected, with the exception of the top 60' or so of the spire.
*The exterior steel window and door frames are installed and the metal studs for the exterior walls have been installed.
*The final basement floor has been poured and all of the main level concrete floors are poured and the concrete stairs at the font are poured.
*Rough electrical and plumbing is being installed and HVAC ductwork is being installed on the main level.
*Excavation has begun for the large underground storm water detention system, which will be installed under the parking lot in the southeast corner of the parking lot.

He and Sister Holbrook also wanted to extend their thanks to the many church members in the various stakes who have provided treats for the workers at the site. The workers are so appreciative of the recognition they're receiving as they build the Temple.

They report that they have many visitors, both members and non-members, at the owner trailer and we continue to encourage as many families and church groups as possible to visit the site while school is still out. After school begins, they will try to make themselves available to meet those who wish to come to the site on weekday evenings or on Saturday or Sunday afternoons and evenings.

Many, many thanks to Elder Kent and Sister Sherrie Holbrook! They are doing a wonderful work. Also, please keep sharing this site so we can broaden its reach in anticipation of the open house and dedication.

Tuesday, June 17, 2014

Stretching skyward!

Here's a great look at the Temple's newly finished metal roof deck!  

The piles of gravel in front of the building are the stone which will be placed inside the building as the base for the concrete floor slab. 

 
 

Sunday, June 8, 2014

Gorgeous Aerial shot!

Check out this aerial view of the temple site!  Glorious!
 
Here are some construction progress details from Elder Holbrook:
 
Work at the Hartford Connecticut Temple construction site is moving along.  The majority of the steel is erected, with the exception of the spire, and the iron workers are busy welding the steel components.
The concrete floor of the mechanical mezzanine, located above the main floor of the temple, was recently poured, and the installation of underground plumbing lines and electrical conduits is underway so the main floor slab can be poured.
 
 

Monday, May 19, 2014

Work on the Steeple!

There's been a whole variety of work going on at the temple site in the last week or so.

The base of the spire was moved into position. The workers have been busy welding the steel frame pieces together. The large crane has been disassembled so that it can be used on another building site. The pipes and other pieces that will provide drainage under the site are being installed.

Take a closer look at the pictures to see all the action!



Above:  Workers are being lifted up to the newly fitted base of the spire to complete the process of securing it to the structure.





Above:  Pipes of all different sizes unloaded and awaiting installation as part of the drainage system for the temple site.



Above:  Installation of draining pipes along the Farmington Ave (Rt 4) side of the site.

Wednesday, April 30, 2014

The Steel work presses on!

On the morning of Tuesday 29th April 2014, the steelwork that forms the front entrance to the temple was being lifted into place and secured to the foundation. The pictures show one of the uprights being installed. Plenty of progress was ...made today, ahead of the rainy weather expected over the next few days.

The last photo shows a partially completed mock-up section of the temple walls that has been installed near the site office. It will allow the workers and the people from the Temple Department in Salt Lake to see what the finished walls will look like.

The yellow crane that was helping to lift the steelwork left the site at about 2pm on Monday, and now the work is being handled entirely by the larger crane.
 
 
 
 
 
 

Saturday, April 19, 2014

Aerial Photos

Here are the latest aerial shots.  Stunning!  Great views of the baptismal font foundation and overall site transformation. 


 
 

Construction Update---April 17, 2014

More steel was put in place on Thursday. The frame is looking more and more like the shape of the temple in the artist's renditions. The large crane is temporarily out of action after experiencing a problem on Wednesday afternoon, so a slightly smaller one was brought in to keep things moving along.

Earth-moving equipment has been busy at the back (southern) part of the temple site removing more soil and rock from the berm.
 
 

Monday, April 14, 2014

We're above ground!

The first of the steel went up today.  How awesome is that?!!

Thursday, April 10, 2014

Today's movement

Today, the steel erection crane was moved into place.  Good day, sunshine!

Wednesday, April 9, 2014

Bring in the steel!

Look what has arrived at the temple site! The first two trailer loads of fabricated steel pieces ready to be lifted into place.


Thursday, April 3, 2014

SAVE THE DATE


Construction Progress pic, April 2, 2014

With the warmer Spring weather finally upon us, the temple site is abuzz with activity. In this picture, workers are preparing for the baptistry walls to be poured (which was scheduled for later today). The latest news from Elder and Sister Holbrook is that the steelwork should start next week.